PoolWindow

Pool opening · State guide

When to Open Your Pool in Virginia

Last updated: July 15, 2026 · 16 cities covered

Virginia's opening calendar spans about 26 days. The earliest model date belongs to Chesapeake (March 31), the latest to Winchester (April 26), and the statewide median lands on April 10.

Every date is the same model — two weeks ahead of the day the local 7-day mean temperature crosses 61°F — applied to each city's own NOAA normals station. Click through for the live water estimate, the full window, and the 12-step checklist.

Virginia model dates from NOAA 1991–2020 normals; every city links to its full guide. Click a column header to sort.
City Open byWindow opens61°F crossing
Alexandria Apr 10Apr 3Apr 24
Arlington Apr 10Apr 3Apr 24
Charlottesville Apr 14Apr 7Apr 28
Chesapeake Mar 31Mar 24Apr 14
Fredericksburg Apr 18Apr 11May 2
Hampton Apr 11Apr 4Apr 25
Lynchburg Apr 25Apr 18May 9
Newport News Apr 10Apr 3Apr 24
Norfolk Apr 7Mar 31Apr 21
Portsmouth Apr 7Mar 31Apr 21
Richmond Apr 10Apr 3Apr 24
Roanoke Apr 12Apr 5Apr 26
Suffolk Apr 10Apr 3Apr 24
Virginia Beach Mar 31Mar 24Apr 14
Williamsburg Apr 9Apr 2Apr 23
Winchester Apr 26Apr 19May 10

Dates are typical-year model outputs, not forecasts — each city guide carries the live widget that tracks the current year against them.

How to use these dates

Each "open by" date is two weeks ahead of that city's own 61°F crossing — the day its 7-day mean temperature (highs and lows averaged, from the nearest NOAA 1991–2020 normals station) reaches the level where unheated pool water starts climbing toward the 65°F algae-growth zone. Opening inside the window means starting up in cold, algae-resistant water: a single label-dosed shock instead of a green-water recovery, and a shopping trip while Virginia stores are still fully stocked.

Dates are typical-year guidance, not forecasts. A warm or late spring shifts the real-world moment by a week or two in either direction — every city guide carries a live water-temperature widget that tracks the current year against these normals, plus the full 12-step opening checklist sequenced to its local window. New to the process? Start with the generic how-to-open guide and the chemicals shopping list, then come back for your city's dates.